Temperature rise test setup as per IEC standard and requirement.
Temperature rise test setup as per IEC standard and requirement.
Magnetic field strength measurement in 3-axes for busbar system.
Flame propagation test setup as per IEC standard and requirement.
Dielectric below freezing point test (>-71°C to ensure our busduct are suitable and safe to operate under cold condition)
100KV AC test with partial discharge meter, capacitor coupling & measurement setup for in-house R&D.
300KV lightning impulse test equipment setup for in-house MV busbar R&D.